Construction company Arčers started using building information modeling and management (BIM) or smart construction in 2017, initially educating the team on BIM modeling and gradually adapting the BIM potential to everyday processes. 

Over these few years, we have appreciated the many benefits of using BIM, so we continue to invest in BIM programs and staff training. BIM:
– allows to create reliable and mutually transparent design information
– helps to effectively plan construction work in order to carry out the project implementation within the specified time limit
– facilitates the availability and applicability of current construction information for the involved parties
– allows to detect potential project challenges or errors in the early stages of the project when they are still easy to correct

Combining the opportunities provided by BIM with the professional experience of our builders, we have created an efficient and professional team that is familiar with the BIM environment and is able to work with partners in the implementation of BIM projects. Therefore, we are proud of our 8 objects, in the construction of which we used Smart Construction — BIM:

JEKABPILS COURT HOUSE

BIM applied: in the design phase.

Result: Development of Architectural, Structural, HVAC, partial MEP,  models during the design process

STOPIŅI MUNICIPALITY COMMUNITY CENTRE

BIM used: at the construction stage: redesign of building structures and communication networks as a 3D model, calculation of building structures, optimization of solutions, coordination of communication openings, construction site — planning of works, optimization of solutions during construction meetings, VR glasses – used for coordination of solutions.

Result: Development of Structural and  HVAC models, coordination of mains openings, use of BIM models with VR glasses.

LUDZA CITY GYMNASIUM SWIMMING POOL

BIM used: in the construction stage. Design of the building structures in 3D, calculation of building structures, planning of optimization and integration of elements for the geometry of a building of complex configuration.

Result: Development of Structural model

CONSTRUCTION OF NEW BARRACKS

BIM used: in the construction stage. For the design of building structures in a 3D model, calculation of building structures, creation of a territory model from topography, 3D scanning of the surface, development of a DVP model, development of a 4D BIM dimension simulation, coordination of the model with the schedule of construction works.

Result: Development of Structural,Building site model, 4D BIM simulation

RĒZEKNE OLYMPIC CENTRE

BIM used: in the construction stage. For the design of architecture, building structures and networks from a 2D design into 3D models, development of detailed design. Approval and coordination of the architectural solution with an emphasis on coordination of the mains openings.

Result: Development and coordination of Architectural, Structural and HVAC models

RIGA ENGLISH GYMNASIUM

BIM used: in the construction stage. For redesign and transfer of building structures from 2D design into a 3D model, development of detailed design, solution coordination, coordination of layouts of mains openings, optimization of solution and retrieval of individual elements.

Result: Development of Structural and Architectural models

REVITALIZATION OF THE DEGRADED TERRITORY OF PĀROGRE INDUSTRIAL PARK

BIM used: in the construction stage. For the design of building structures, verification and optimization of calculations, coordination of Structural models and development of detailed design.

Result: development and coordination of Structural models, verification of Structural model calculations 

CONSTRUCTION OF MĀRUPE PRIMARY SCHOOL AND SPORTS GROUND

Use of BIM processes in the initial design phase of the project:

During the design process: BIM training for the involved design parties, creating models for separate disciplines based on the 2D design, calculation of Structural models, mutual coordination process, retrieving volumes.

The result of the design stage: Developed BEP. Developed BIM models of Architecture, Structural, MEP and HVAC models, coordinated BIM-federated model and problem report.

Use of BIM in the construction stage: further development of the models at the construction site for the development of detailed design, planning and control of the status of the course of the construction.

Received award – 2nd place in the competition “Latvian Construction Award 2019” in category BIM object.

 

OFFICE BUILDING REBUILDING AND TERRITORY IMPROVEMENT Katlakalna Street 11E, Riga

Use of BIM processes in the project design phase: Development of survey BIM model, development of BIM models for several project disciplines.

Result of the design stage: Developed BEP, LOD Matrix, ESS MAS. Developed BIM models of Architecture, Interior, Structural, EL, MEP and HVAC models, BIM compatible model has been coordinated and a report has been created.

Further use of BIM during the construction phase is envisaged: further development of the model on the construction site for elaboration of details, planning and control of the status of the construction progress.